Sale!

TEYASI Phone Charger Cable 2M and Dual USB Plug Adapter UK 2.1A Smart IC Fast Charging for iPhone Xs/Xs Max/XR/X 8/7/6/6S Plus 10 SE/5S iPad iPod,Mini USB Wall Plug with long Lead

£9.99

Category:

Description

Price: £10.99 - £9.99
(as of Aug 03,2021 04:22:24 UTC – Details)


Product Description

logologo

dsds

gg

11

2.1A Charging Listing

Huawei

Mate 30 Pro / Mate 30 / Mate 30 Lite / Mate X / Mate 20 Pro / Mate 20 / Mate 20 Lite / Mate 10 Pro / Mate 10 P40 Pro / P40,P30 Pro / P30 / P20 Pro / P20 / P10 Pro / P10

Samsung

Galaxy A10e / A11 / A20 / A21 / A20e / A20s / A21S / A30 / A30s / A40 / A42(5G) / A50 / A50s / A51 / A51(5G) / A51(5G)UW / A60 etc Galaxy A7 (2017) / Galaxy A8 (2018) / Galaxy A8+ (2018) etc Galaxy M10 / M11 / M20 / M21 / M30 / M31 / M40 / M41 / M51 etc Galaxy S6 / S6 edge+ / S7 / S7edge / S8 / S8+ / S8 Active / S9 / S9+ / S10e / S10 / S10+ etc Galaxy Tab S6 lite / Tab S6 / Tab S5e etc Galaxy note7 / note8 / note9 etc

OnePlus

OnePlus 8/8Plus,OnePlus 7,OnePlus 6T / 6,OnePlus 5T / 5,OnePlus 3T / 3 etc

Sony

Xperia XA2 / XA1 / L / XZ / XZ Premium /Z4 / Z4 Tablet, Z3 / Z3 Compact / Z3 Tablet Compact etc

HTC

HTC 10 / One A9 / U Ultra / U11 / One (M8) / One (M9) etc

For iPhone

iPhone 12,11,11 Pro,SE 2020,XS,XR,X,8,8 Plus,ipad 2018,ipad 2019 etc

2.4A Cable Charging Listing

For iPhone

iPhone 12,11,11 Pro,SE 2020,XS,XR,X,8,8 Plus,ipad 2018,ipad 2019 etc

What you can get:

TEYASI Dual Ports 2.1A USB Plug*1;2M Cable*1;Manual*1

Color

Black

White

White

Black

White

Black

Port Type

USB

USB

USB

USB

USB

USB

Fast Charging

QC3.0/2.0/AFC/FCP/2.4A high spped

Smart IC/2.4A High Speed

Smart IC/2.4A High Speed

Smart IC/2.4A High Speed

QC3.0/2.0/AFC/FCP/2.4A high spped

QC3.0/2.0/AFC/FCP/2.4A high spped

Total Output

30W

25W

15W

15W

34W

34W

Output Current

3.0 Port:5V/3A, 9V/2A, 12V/1.5A ;USB1/2: 5V/2.4A

USB(1/2/3/4):5V/2.4A Total 25W/5A

USB 1/2/3:5V/3.1A

USB 1/2/3:5V/3.1A

3.0 Port:5V/3A, 9V/2A, 12V/1.5A USB1/2/3: 5V/3.1A

3.0 Port:5V/3A, 9V/2A, 12V/1.5A USB1/2/3: 5V/3.1A

Input

100-240V≈50/60Hz

100-240V≈50/60Hz

100-240V≈50/60Hz

100-240V≈50/60Hz

100-240V≈50/60Hz

100-240V≈50/60Hz

Package Included

Manual*1;USB Plug*1

Manual*1;USB Plug*1

Manual*1;USB Plug*1

Manual*1;USB Plug*1

Manual*1;USB Plug*1

Manual*1;USB Plug*1

✔Universal Compatibility:TEYASI fast usb plug is compatible with iPhone Se2020 11 12 XS, XS Max, XR, X, 8, 8 Plus, 7, 7 Plus, 6s, 6s Plus, 6, 6 Plus, iPad 4, iPad 5, iPad Air, iPad Air 2, iPad Mini, iPad Mini 2, iPad Mini 3, iPad Mini 4, iPad Pro,Samsung Galaxy S10/S9/S8/S7/S6/A80/ A70S/ A60/ A50S/ A40/ A30S, Note 10+/9/8/7, OnePlus 7t / 7 Pro/ 6T, LG G8 / G7 / V50/ V40 Xiaomi,Motorola,LG,HTC,and More.
✔Power Charger Plug:Charge compatible devices fastest than conventional charger plug charging.adaptively charges all standard USB-powered devices at up to 2.1Amp.
✔Smart IC Technology: This plug built-in intelligent IC can auto-detect devices connected in each port while also identifying the appropriate current to charge each of your device optimally at their fully intended speeds up to a total of 2.1A and guarantee your devices are charging at their maximum speed, the sophisticated protection measures to ensure safety for you and your device.
✔Multi Safety Protection:TEYAS fast charger plug have passed the UK/European charger safety certification standards. For example UL-FCC-CE.And it built-in Short circuit protection/ Overvoltage protection/ Overheating protection ect.Which can give you a security guarantee experience.
✔Most Satisfactory After-Sales Service:The 2.1A mini USB Plug is made of high-quality materials.It’s important to choose a truly safe certified charger.If you have other questions, you can contact us at any time.We will reply you within 24 hours.You also get 12 Months Warranty.
✔What you can get:TEYASI Compact 2.1A USB Plug Charger*2;Manual*1